To prepare for an SQF audit, confirm your SQF code and scope, name a trained primary and substitute SQF Practitioner, register your site in the SQFI Assessment Database, and choose an SQFI-licensed certification body. Then document your system and run it long enough to build records. SQFI recommends at least 90 days. Finish with a full internal audit against SQFI's free checklist, root-cause fixes for every gap, a management review, and practice for staff interviews. To get certified under either edition, you need a score of 70 or more, no critical findings, and every minor and major finding closed within 30 days under Edition 9 or 40 days under Edition 10.

At a glance

SQF Audit Preparation at a Glance

An SQF audit checks two things. First, that your written food safety system meets the SQF code you're being audited against. Second, that your people follow it every day, with records to prove it. SQFI sums it up as "say what you do" and "do what you say."[1] The auditor checks both, and a gap in either costs points, so preparation means having the documents and the records that show you follow them.

  • 90 daysMinimum records SQFI recommends before an initial certification auditSQF Code, Part A[2][3]
  • 70Lowest passing score under Editions 9 and 10SQF Code, Part A[2][3]
  • 30 daysTo close every minor and major finding under Edition 9 (40 days under Edition 10)SQF Code, Part A[2][3]
  • Jan 2, 2027Earliest date Edition 10 audits can start, depending on GFSI benchmarkingSQFI Edition 10 FAQ[4]

Key takeaways

  • Your audit date decides your edition. Audits before Edition 10 audits begin use Edition 9. Edition 10 audits start no earlier than January 2, 2027, and only once GFSI recognizes Edition 10. A site starting from scratch now should build to Edition 10.[4][5]
  • Have records ready, not just documents. SQFI recommends at least 90 days of records before an initial audit. Under Edition 10, those records should include every activity done at least once a year, and the recommendation also covers a re-certification audit during an edition change.[2][3]
  • Expect the auditor to look at the whole site, inside and out, and at operating and cleaning shifts. Evidence comes from records, staff interviews and observation.[2][3]
  • The score is 100 minus deductions: 1 point per minor, 5 per major and 50 for a critical. Edition 10 adds heavier Core Clause deductions (2 and 7) and lowers the score for a 12-month cycle from 86 to 80.[2][3]
  • Every minor and major finding needs a root cause analysis and verified corrective action within 30 days under Edition 9, or 40 under Edition 10. Miss it at an initial audit and the site can't be certified. Miss it at a re-certification or surveillance audit and the certificate is suspended.[2][3]

Sources checked as of October 13, 2026, against the SQF Food Safety Code: Food Manufacturing (Edition 9), the Edition 10 Part A (updated September 1, 2026) and Food Manufacturing checklist, SQFI's Edition 9 code amendments, and SQFI guidance pages. Clause numbers are from the Food Manufacturing code. Other SQF food safety codes follow the same Part A process with their own Good Industry Practice module.

Edition

Which SQF Edition Will Your Audit Use?

It depends on the audit date. SQFI expects Edition 10 audits to begin on January 2, 2027, but that date depends on GFSI benchmarking and could move later. It won't move earlier. Until GFSI recognizes Edition 10, Edition 9 is the only GFSI-recognized SQF edition, and audits before the start date are to Edition 9.[4][6]

Benchmarking is still under way. GFSI opened its public consultation on SQF Edition 10 on September 29, 2026, which is a required step before recognition.[7] Two more rules help with planning. A surveillance audit that follows an Edition 9 audit stays on Edition 9, even if it happens after the Edition 10 start date. And certification bodies won't mix requirements from both editions in one audit.[5]

If you're working toward your first certification, build your system to Edition 10. SQFI says to prepare for Edition 10 if you're scheduling a new certification audit during the transition.[5] A site that starts keeping records in mid-October 2026 won't have SQFI's recommended 90 days of records until mid-January 2027, after the earliest Edition 10 start date. If benchmarking runs late and your audit falls before Edition 10 audits begin, it will be to Edition 9, so confirm the edition with your certification body when you book. Edition 10 renumbers many clauses, but SQFI doesn't require your own procedures to follow the code's numbering.[4]

Re-certifying in early 2027?

Your audit date decides the edition, so if your 60-day re-certification window straddles the Edition 10 start date, the date you agree with your certification body matters. For a re-certification audit during an edition change, Edition 10 recommends at least 90 days of records, including every activity done at least once a year, and your certification body can ask for more.[3] Count back 90 days from your audit date. By then, Edition 10's new requirements should be running: the food safety culture assessment plan (2.1.1.3), change management (2.3.5), the risk-based environmental monitoring assessment (2.4.8.1) and documented training assessments (2.9.1.2). Edition 10 also asks for blackout dates at least 90 days before the audit window opens (2.1.1.5).[8] Ask your certification body now which edition it expects to audit and which records it wants to see. In an unannounced year, the certification body picks the date.

Scope

What Does an SQF Audit Check?

An SQF audit is a third-party assessment by an auditor from an SQFI-licensed certification body. It checks that your documented system meets the SQF code for your food sector categories, and that your site actually works that way. For a food manufacturer, the code is Module 2 (system elements) plus Module 11 (good manufacturing practices). Mandatory clauses can't be marked "not applicable" or excluded. Other clauses can be marked not applicable only when you can justify it. Under Edition 10, a justification or risk assessment must be available during the audit, and the same applies to any clause where you use alternative controls. Have these ready before audit day.[2][3]

Where SQF auditors get their evidence
EvidenceWhat the auditor looks atHow to prepare
Documents and recordsPolicies, procedures, work instructions, specifications, your food safety plan, and the records that show each was followed. Records must be legible and easy to retrieve. Edition 9 also requires each record to be confirmed by the person who did the monitoring (2.2.3.2), and under both editions responsible staff authorize each verified record (2.5.2.1).[2][8]Pull a sample of every record type and check for gaps, missing signatures and unverified entries.
InterviewsSenior site management, CCP operators, supervisors, shift workers, and maintenance, production and sanitation staff. Questions are usually open-ended, such as how you monitor a CCP or what you'd do about a food safety issue.[9]Make sure people can explain their own tasks in their own words and language. SQFI says auditors listen for leaders and line workers to describe food safety the same way, and they ask for real examples.[10]
ObservationThe whole site, including exterior grounds, docks and storage areas, even parts outside the scope of certification. The auditor watches staff follow GMPs and SOPs on operating and cleaning shifts and checks pre-operational inspections where they apply.[2][9]Walk the site the way an auditor would, including the outside and the places nobody visits.
Product trace (vertical audit)Under Edition 10, the auditor follows targeted products through the process and uses them to review the related records, procedures and food safety plan.[3]Pick one product, trace it from receiving to shipping, and pull every record that touches it.

Part of an announced audit can be done remotely by agreement, but at least half of the audit time must be on site, and the on-site part happens only while your main processes are running. Unannounced audits are entirely on site. When part of an audit is remote, SQFI expects the auditor to spend 80% of the on-site time observing and interviewing, under both editions, so prepare your floor and your people, not just your paperwork. For a food manufacturer, a certification or re-certification audit lasts at least two days, counting remote and on-site work. Under Edition 10, an initial audit may add half a day. Your certification body sets the actual length based on site size, staff numbers, process complexity and risk.[2][3]

Not a food manufacturer?

Slaughter, meat and poultry processing, and seafood processing plants (food sector categories 7, 8 and 9) use the Animal Product Manufacturing code, though canning of meat, poultry or seafood falls under the Food Manufacturing code. Packaging makers, warehouses and primary producers have their own codes.[11] The audit process in Part A is the same, but minimum lengths differ. Under Edition 10, storage and distribution and packaging audits run at least one day, and primary production at least half a day. Seasonal sites have their initial audit during the peak of the season.[3]

Step by step

How Do You Prepare for an SQF Audit, Step by Step?

Most of the work happens months before the auditor arrives. These steps are drawn from Part A of the code and SQFI's "Get Certified" pages. The timing labels are a practical guide, not SQF requirements. The 90-day label follows SQFI's advice, in both editions, to have at least 90 days of records before the audit. SQFI recommends this but doesn't require it. For a sense of scale, our SQF certification page puts most first-time sites at six to twelve months from SQFI registration to certificate.[18]

  1. Confirm your code and scopeUse SQFI's Code Selector and its food sector category list to find the code and food sector categories (FSCs) for your products. Agree the scope with your certification body before the audit: the premises, FSCs, products and processes. Any exclusion must be requested in writing before the audit, and it can't be promoted as certified. The scope can't change once the audit has started.[1][3][11][12]First
  2. Name a primary and substitute SQF PractitionerBoth must work at the site, have completed HACCP training and be able to run your food safety plans. Under Edition 9, the HACCP course must be at least two days long and assessed. Edition 10 defines HACCP training as a course based on Codex HACCP principles, recognized and widely used in the country, delivered by a recognized institution, with the person's knowledge assessed. The substitute needs the same qualifications as the primary and must be trained and ready to step in. SQFI's Implementing SQF Systems course is strongly recommended but not required.[2][8][13][14]First
  3. Register and choose a certification bodyRegister the site in the SQFI Assessment Database before any audit and renew each year. SQFI's posted registration fee for one Edition 9 Food Manufacturing code is $650 (rate in effect as of April 1, 2024). Then sign an agreement with an SQFI-licensed certification body that covers scope, audit length, fees and close-out costs. SQFI suggests choosing early so your preferred audit dates are open.[2][12][15]Before booking
  4. Document the systemWrite the policies, procedures, work instructions and specifications that meet Module 2 and your Good Industry Practice module (Module 11 for food manufacturing). Build your HACCP-based food safety plan from a hazard analysis of every product and process.[1][2]Say what you do
  5. Run it and build recordsFollow the procedures and keep the records. SQFI recommends at least 90 days of records before the audit. Book the yearly activities in the table below so they're done before audit day.[1][3]90 days or more
  6. Do a full internal auditAudit every applicable clause against SQFI's checklist or a similar tool, with trained auditors who are independent of the area where practical. This is required at least once a year anyway, and SQFI says it can be split into pieces through the year as long as everything is covered.[2][16][17]Before the audit
  7. Fix gaps at the rootTreat every internal finding as a non-conformity: find the root cause, act on it, and check that the fix worked. Those records are evidence too.[2]Before the audit
  8. Hold the management reviewSenior site management must review the whole SQF System at least once a year, including food safety culture performance, objectives, audit and complaint trends, and actions from the last review.[2]Before the audit
  9. RehearseTrace one product up and down the chain, check that interviewees know their tasks, and walk the whole site, including the exterior. Each SQFI guidance document includes a "RIO: Road to Audits" list of the records, interviews and observations an auditor uses for that topic, which makes a good rehearsal script. SQFI also allows an optional pre-assessment, which your own Practitioner can run.[1][2][17]Final weeks
  10. Set up audit weekSchedule production so the main processes are running, make sure the Practitioner and key staff are on site, and invite senior management and the food safety team to the opening meeting.[2][9]Audit week
Records

Which Yearly Records Will the Auditor Ask For?

Yearly activities are easy to postpone, and an auditor will ask for the latest record of each. SQFI lists management review and internal audits among the common minor findings under Edition 9.[19] Under Edition 10, SQFI recommends at least 90 days of records, including every activity done at least once a year, before an initial audit and before a re-certification audit at an edition change, such as your first Edition 10 audit.[3] The table lists the main yearly activities with their Edition 9 Food Manufacturing clause numbers. The note below it covers Edition 10.

Yearly and monthly records an SQF auditor expects (Edition 9 Food Manufacturing)
ActivityClauseHow often
Management review of the whole SQF System2.1.2.1At least once a year
Practitioner update to senior management, documented2.1.2.2At least monthly
Full review of the food safety plan2.4.3.14At least once a year, or when something changes
Review of critical limits2.5.1.1Once a year
Internal audit of every applicable clause2.5.4.1At least once a year
Review of the trace system2.6.2.1At least once a year
Recall and withdrawal test (one step back, one step forward)2.6.3.2At least once a year
Crisis management plan review and test2.6.4.2At least once a year
Food defense threat assessment and plan review and test2.7.1.4At least once a year
Food fraud vulnerability assessment and mitigation plan review2.7.2.4At least once a year
Backflow testing, where possible11.5.1.4At least once a year
Water and ice microbiological testing11.5.3.2Risk-based, at least once a year
Compressed air and other gases testing11.5.5.2Risk-based, at least once a year
Ambient air testing in high-risk areas11.7.1.2At least once a year

Edition 9 Food Manufacturing clause numbers. Edition 10 keeps these activities. In a single clause (2.2.3.3), it requires records for every yearly activity and names the main ones, such as management review, internal audit, and the recall, trace and crisis tests. It adds others, such as a yearly evaluation of the environmental monitoring program (2.4.8.1) and a yearly review of GMP risk assessments (11.1.1.1).[2][8]

Checklist

SQF Audit Preparation Checklist

Use this list to check readiness, then run your full internal audit against SQFI's official checklist for your code. SQFI publishes free Excel checklists for most Edition 9 and Edition 10 codes, including Food Manufacturing, on its Guidance & Checklists page.[16] SQFI's Edition 9 code amendments are audited with the Edition 9 codes, so they're included.[20] Clause numbers below are from the Edition 9 Food Manufacturing code, except the last group, which is Edition 10. If your audit will be to Edition 10, use SQFI's Edition 10 checklist and give the last group extra time.[2][8]

Registration and scope

  • SQFI registration is current. The site is registered in the SQFI Assessment Database and the scope shown there matches your agreement with the certification body (Part A).
  • Exclusions are approved in writing. Anything excluded from scope was agreed before the audit and isn't promoted as certified.

Management commitment (2.1)

  • Food safety policy is signed and posted. It covers food safety culture and is communicated in languages staff understand (2.1.1.1).
  • Primary and substitute Practitioners are named. Both have HACCP training on file and job descriptions that match what they actually do (2.1.1.3 to 2.1.1.5).
  • Management review is done and recorded. It covers food safety culture performance and trends, and the monthly Practitioner updates are documented (2.1.2).
  • Complaints are trended. Adverse trends have a root cause and a corrective action (2.1.3).
  • Blackout dates went in on time. For an unannounced re-certification audit, the dates and reasons reach your certification body at least one month before the 60-day re-certification window (2.1.1.8).

Documents and records (2.2)

  • Only current versions are in use. Obsolete documents are out of the work areas (2.2.2).
  • Records are complete and signed. Each is legible, confirmed by the person who did the monitoring, verified where required, and retrievable (2.2.3, 2.5.2).

Suppliers and specifications (2.3)

  • Specifications are current. Raw material, packaging and finished product specs are on file (2.3).
  • Approved supplier program is risk-based. Supplier approval and monitoring records are up to date, and the approved supplier register lists contact details for every approved and emergency supplier (2.3.4, Edition 9 Amendment 002).

Food safety plan and verification (2.4, 2.5)

  • Hazard analysis covers every product and process. Including ingredients, rework and new lines (2.4.3).
  • CCPs are monitored, verified and validated. Critical limits were reviewed this year and deviations have recorded actions (2.4.3, 2.5.1, 2.5.2).
  • A verification schedule exists and is followed. It says who verifies what and how often (2.5.2.2).
  • Environmental monitoring is risk-based and trended. The sampling schedule names the pathogens or indicator organisms, the number of samples and how often they're taken, and results are tracked and trended, with preventive action on poor results (2.4.8).
  • Internal audit and inspections are complete. Every finding has a root cause and a closed corrective action (2.5.3, 2.5.4).

Traceability, recall, defense and fraud (2.6, 2.7)

  • This year's recall test passed. One step back and one step forward, with products from different shifts (2.6.3.2).
  • Crisis, food defense and food fraud plans were reviewed this year. Tests and reviews are recorded (2.6.4, 2.7.1, 2.7.2).
  • Staff know the 24-hour notice rule. Your recall plan lists SQFI, your certification body and the regulatory authority as essential contacts. SQFI and your certification body must be told in writing within 24 hours of a regulatory warning or event, or a food safety event that needs public notice (2.4.1.3, 2.6.3.1, 2.6.3.4).

Allergens and training (2.8, 2.9)

  • Allergen cleaning is validated and verified. Changeovers and label checks are recorded (2.6.1.2, 2.8.1).
  • Training records show competence. Each record names the skill, date and trainer and confirms the person is competent. Refresher needs are identified (2.9.2).

Good manufacturing practices (Module 11)

  • Pest prevention is managed, not outsourced and forgotten. The site map, device list, contractor reports, trend reviews and follow-up actions are current (11.2.4).
  • Cleaning is documented and verified. Procedures say what is cleaned, how, when and by whom, and records show it happened (11.2.5).
  • The site is in good repair. Floors, walls, ceilings, drains and equipment are maintained (11.1, 11.2).
  • Measuring and inspection equipment is calibrated. There's a list of equipment that needs calibration, current calibration records, and a procedure for product checked with equipment later found out of calibration (11.2.3).
  • Foreign matter controls work. Glass and brittle items in food zones are on an inventory and inspected, glass instrument dial covers and mercury-in-glass thermometers are checked at the start of each shift, and metal detectors or other detection equipment are monitored, validated and verified (11.7.3, 11.7.4).
  • Medical screening includes visitors and contractors. The site has a medical screening procedure for all employees, visitors and contractors who handle exposed product or food contact surfaces (11.3.1.1, Edition 9 Amendment 001).
  • Water, ice and air testing is current. Including backflow testing where possible and ambient air in high-risk areas (11.5, 11.7.1.2).

If your audit is to Edition 10, also check

  • A food safety culture assessment plan is in place. It covers communication, training for all staff including management, staff feedback, and regular measurement (2.1.1.3).
  • Changes go through a change management procedure. Including temporary and emergency changes (2.3.5).
  • Environmental monitoring starts from a risk-based assessment. Target organisms come from your own hazard analysis, and the program is evaluated each year (2.4.8).
  • Key training includes a documented assessment. For example, for staff who monitor CCPs, run corrective actions or do internal audits (2.9.1.2).
  • Blackout dates reach your certification body early. At least 90 days before the audit window opens (2.1.1.5).
  • Both yearly tests are on file. A traceability test on products from different shifts and on shared or bulk materials (2.6.2.1), and a recall test that covers the whole recall program (2.6.3.2).
Audit day

What Happens on Audit Day?

An SQF audit follows a set pattern. Here's what to expect.

  1. Opening meetingAt least the food safety team and senior site management attend. The auditor confirms the scope and agenda.[9]
  2. Document and record reviewThe auditor reviews the food safety plan, CCP records and validation and verification records, and checks that required records are up to date and signed.[9]
  3. Site inspectionThe whole site: buildings inside and out, grounds, docks and storage, plus operating and cleaning shifts and pre-operational inspections where they apply.[2][9]
  4. Interviews and observationStaff at every level are asked open-ended questions while the auditor watches whether SOPs and GMPs are followed and monitoring is done correctly.[9]
  5. Closing meetingThe auditor goes over every non-conformity before the audit closes, along with the deadlines for closing them. Under Edition 10, the auditor must give them to you in writing.[2][3][9]

If the auditor finds a critical non-conformity, they tell you right away and notify the certification body. Edition 10 adds that the audit then continues as scheduled.[2][3] Your auditor can explain what a finding means, but can't tell you how to fix it. That keeps the certification impartial.

Practical tips for audit day
  • Answer the question asked, honestly. "I don't know, but here's where we record it" is better than a guess.
  • Let people who do the work explain it. The auditor wants to hear from operators, not only managers.
  • Have a runner who can find any record quickly, so the audit isn't waiting on a search.
  • Write down each finding as it's raised and agree on the facts before the closing meeting.
Scoring

How Is an SQF Audit Scored?

The score is 100 minus the points deducted for each non-conformity. A minor is a random or occasional lapse. A major is a failed system element, a systemic breakdown, a serious deviation, or no evidence of compliance. A critical is a breakdown of control at a CCP, prerequisite program or other process step that's likely to cause a significant public health risk or contamination. It also covers systemic falsification of records.[2][3]

SQF point deductions by edition
FindingEdition 9Edition 10
Minor1 point1 point
Core Clause minorNot used2 points
Major5 points5 points
Core Clause majorNot used7 points
Critical50 points50 points
SQF audit scores and ratings by edition
ScoreEdition 9Edition 10
96 to 100E (Excellent): certificate, 12-month re-certificationCertified: 12-month cycle
86 to 95G (Good): certificate, 12-month re-certificationCertified: 12-month cycle
80 to 85C (Complies): certificate plus a 6-month surveillance auditCertified: 12-month cycle
70 to 79C (Complies): certificate plus a 6-month surveillance auditCertified with Surveillance: certificate plus a 6-month surveillance audit
0 to 69F (Fails to comply): no certificate at an initial audit. At a re-certification or surveillance audit, the certificate is suspended immediately. It's reinstated after a successful site visit, and after a re-certification audit an unannounced surveillance audit follows within 6 monthsF (Fails to comply) at an initial audit: no certificate. At a re-certification or surveillance audit, the rating is "Certified with Unannounced Surveillance" and the site is suspended at once. At a re-certification audit, the code counts this as a failed audit. The certificate is reinstated after a successful site visit, and after a re-certification audit an unannounced surveillance audit follows within 6 months

Edition 9: Part A 9.2, 11.2 and Step 13. Edition 10: Part A A2:19, A2:24 and A2:28 (updated September 1, 2026).

Here's how the math works. Four minors and two majors cost 14 points, for a score of 86. That's a G under Edition 9 and Certified under Edition 10. Under Edition 10, say one of those minors and one of those majors were against Core Clauses. The three regular minors cost 3 points, the Core Clause minor 2, the regular major 5 and the Core Clause major 7. That's 17 points, for a score of 83, still Certified with a 12-month cycle. Three Core Clause majors on their own cost 21 points, for a score of 79, which brings a 6-month surveillance audit. A single critical takes 50 points, so even an otherwise perfect audit scores 50. That fails an initial audit, and at a re-certification audit it means immediate suspension.

A critical means failure or suspension

A critical at an initial certification audit is an automatic failure, and the site has to reapply. At a re-certification audit, a critical leads to immediate suspension under both editions. Under Edition 9 it does so through the resulting F rating, and Edition 10 says so directly.[2][3] Under the code's definition, a critical could be a CCP running out of control with no action taken, or records that are systematically falsified.

Findings

Which Findings Do SQF Auditors Write Most?

SQFI's own analysis of Edition 9 audits points to pest prevention, the food safety plan, and cleaning and sanitation as the biggest problem areas, with management review and internal audits common among minor findings.[19]

Most common SQF Edition 9 non-conformities, per SQFI
AreaWhat SQFI foundWhat to check
Pest preventionSQFI's leading Edition 9 non-conformity, with both major and critical findings. Using a contractor doesn't move the responsibility.[19]Review contractor reports and trends yourself, act on activity, and keep the site map and device list current (11.2.4).
Food safety planAlways on SQFI's list, and under Edition 9 many findings are graded critical. Common causes: a missing hazard analysis, an incomplete ingredient hazard analysis, and misidentified CCPs.[19]Check that every ingredient and process step has a hazard analysis and that CCP decisions are justified (2.4.3).
Cleaning and sanitationSecond on SQFI's Edition 9 list of majors. Condition of equipment, utensils, floors, walls, ceilings, doors and junctions matters.[19]Inspect the building fabric and equipment condition, not just the cleaning records (11.2.5, 2.5.4.3).
Management reviewOn SQFI's Edition 9 minor list. SQFI's advice is to make sure the review covers food safety culture performance.[19]Make sure the review covers each item in 2.1.2.1, including culture.
Internal auditsMoved from SQFI's list of majors to its list of minors under Edition 9.[19]Audit every applicable clause each year and close every finding (2.5.4).

Source: SQFI's July 2023 analysis of Edition 9 audit findings. SQFI didn't publish the number of audits or the period covered. SQFI showed the same top three in a January 2024 presentation, and we found nothing newer as of October 2026.[21]

Edition 10 weights three of these five areas more heavily: the food safety plan, cleaning and sanitation, and management review. Its Food Manufacturing Core Clauses, which cost more points, are management responsibility, management review, complaint management, the approved supplier program, the food safety plan, environmental monitoring, corrective and preventive action, product identification, allergen management, cleaning and sanitation, and foreign matter control.[8] Pest prevention and internal audits aren't on that list, so those findings keep the standard 1 and 5 point deductions.

For help writing corrective actions that hold up, see our guide to root cause analysis in SQF audits.

After the audit

What Happens After the Audit?

After the closing meeting, the clock starts. Under Edition 9, every minor and major must have a documented root cause analysis and corrective action that the auditor verifies and closes within 30 calendar days. If you miss it at an initial audit, the certification body can't certify the site and you have to reapply. If the site is already certified, the certificate is suspended right away.[2]

More time is possible when a fix takes longer. For a minor, that's when there's no immediate threat to product safety and temporary controls are in place. For a major, that's when the fix needs structural work, depends on the season, or has long lead times, with interim controls in place. Either way, the finding is still closed in the database on time, with the plan and completion date recorded.[2][3]

You submit corrective actions in the SQF Assessment Database. The site's primary contact goes to Action Items, reassigns the corrective action plans to themselves, then opens each one, describes the action taken and uploads evidence such as documents, photos or logs. Once every finding is entered, they select Submit.[22] Under both editions, the evidence for every minor and major finding must include a documented root cause analysis.[2][3] The certification body reviews each one and can send it back for more information, so submit early enough to allow a second round. If you can't meet the deadline, contact your certification body right away.[22]

SQF timelines after the audit
StepEdition 9Edition 10
Reviewed audit report availableWithin 10 days of the last audit dayWithin 10 days
Corrective actions verified and closedWithin 30 days, with a root cause analysis for every minor and majorWithin 40 days, with root cause analysis
Certification decisionWithin 45 days of the last audit dayWithin 50 days
Certificate issuedWithin 10 days of the decisionWithin 5 days of the decision
Certificate valid until75 days after the anniversary of the initial audit80 days after the anniversary
Re-certification auditWithin 30 days either side of the anniversary of the initial auditSame window
Surveillance audit (lower scores)C rating: 30 days either side of the 6-month anniversaryCertified with Surveillance: same timing
Unannounced auditOnce every three years, within the 60-day re-certification windowOnce every three years, within the same window. Ask your certification body which year of the cycle you're in

Edition 9: Part A Steps 9 to 12. Edition 10: Part A A2:11, A2:14 and A2:20 to A2:26 (updated September 1, 2026).[2][3]

Under Edition 10, if a non-conformity repeats from the last audit, the auditor may add non-conformities under the corrective and preventive action clause, which is a Core Clause. Missing the 40-day deadline makes a site ineligible for certification, and a certified site that misses it is suspended.[3] SQFI says the unannounced audit requirement hasn't changed with Edition 10, but the Edition 10 text counts the first three-year cycle from the first re-certification audit, so confirm the timing with your certification body.[3][4]

Edition 10

How Does Edition 10 Change Audit Prep?

Edition 10 keeps the same audit process but raises the stakes in a few places. These are the changes that matter most for preparation:

  • Core Clauses. Findings against Core Clauses cost 2 points for a minor and 7 for a major, instead of 1 and 5.[3]
  • New scoring bands. A score of 80 or more earns a 12-month cycle. Scores from 70 to 79 bring a 6-month surveillance audit.[3]
  • Food safety culture assessment plan. Every site needs a documented plan covering communication, training for all staff including management, a way to collect staff feedback, and regular measurement (2.1.1.3). It sits inside Core Clause 2.1.1, Management Responsibility, so a finding here costs 2 points for a minor or 7 for a major.[4][8]
  • Change management. A new clause requires a procedure to evaluate changes, including temporary and emergency ones, to formulations, materials, equipment, specifications and the food safety plan (2.3.5).[8]
  • Environmental monitoring. It's now a Core Clause, and the program must be evaluated each year or when trends or changes affect product safety (2.4.8).[8]
  • Longer close-out, stricter follow-up. Corrective actions get 40 days instead of 30, but a repeat finding can bring extra non-conformities.[3]
  • Earlier blackout dates. The Practitioner must send blackout dates to the certification body at least 90 days before the audit window opens (2.1.1.5).[8]
  • Training with a documented assessment. Training for key roles, such as CCP monitoring, corrective action and internal auditing, must include a documented assessment (2.9.1.2).[8]
  • More triggers for regulatory notice. Edition 9 already requires written notice to SQFI and the certification body within 24 hours of a regulatory warning or event. Edition 10 keeps the 24 hours and adds a regulatory action or the site being named in an outbreak. Notice to SQFI now goes through sqfi.com/regulatory instead of email (2.4.1.3).[2][8]

SQFI offers an Edition 10 conversion course, and licensed training centers teach the changes too.[4] Kiwa ASI, an SQFI Licensed Training Center, teaches an SQF Edition 10 conversion course. It's offered through ASI Training and Consulting, LLC, which operates separately from the certification body and has no effect on audit outcomes. For a deeper look at the changes in one code, see our SQF Edition 10 Storage and Distribution guide.

Support

How Kiwa ASI Can Help

Kiwa ASI provides SQF certification audits through ASI Food Safety, LLC, an SQFI-licensed, ANAB-accredited certification body. See our SQF certification page for audit options and to request a quote.

To build your team's skills, training includes Implementing SQF Systems, SQF Advanced Practitioner, the Edition 10 conversion course, Principles of Internal Auditing and HACCP training. Training is offered through ASI Training and Consulting, LLC, which operates separately from the certification body and has no effect on audit outcomes.

FAQ

Frequently Asked Questions

What is an SQF audit?

An SQF audit is a third-party assessment by an auditor from an SQFI-licensed certification body. It checks that your written food safety system meets the SQF code for your food sector categories, and that the site actually works that way, using records, staff interviews and observation.

How long does it take to prepare for an SQF audit?

It depends on how much of a HACCP-based system you already have. SQFI recommends at least 90 days of records before an initial certification audit, so plan to have the system documented and running at least 90 days before audit day. On our SQF certification page, we put most first-time sites at six to twelve months from SQFI registration to certificate.

What score do you need to pass an SQF audit?

At an initial audit, a score of 70 or more, with no critical non-conformities, and every minor and major closed on time. Under Edition 9, 86 or more means a 12-month cycle and 70 to 85 adds a 6-month surveillance audit. Under Edition 10, 80 or more means a 12-month cycle and 70 to 79 adds the surveillance audit.

How often are SQF audits?

Every 12 months. Re-certification audits fall within 30 days either side of the anniversary of the last day of the initial certification audit. Sites that score 70 to 85 under Edition 9, or 70 to 79 under Edition 10, also get a surveillance audit around the 6-month mark. One re-certification audit every three years is unannounced (under Edition 9, sites in an SQF multi-site program are exempt).

How long does an SQF audit take?

For a food manufacturer, a certification or re-certification audit takes at least two days, counting remote and on-site work, and an Edition 10 initial audit may add half a day. The certification body sets the actual length based on site size, number of employees, process complexity and food safety risk, and documents it in your agreement.

Will my next SQF audit be to Edition 9 or Edition 10?

It depends on the audit date. SQFI expects Edition 10 audits to start on January 2, 2027. They won't start earlier, and could start later if GFSI benchmarking takes longer. Audits before that start date are to Edition 9. A surveillance audit that follows an Edition 9 audit stays on Edition 9, and certification bodies don't mix the two editions in one audit. If you're preparing for a first certification now, build to Edition 10.

Do you need a mock audit or a mock recall before an SQF audit?

A mock audit, or pre-assessment, is optional. SQFI says it can help find gaps before the initial certification audit, and that your own designated employee or SQF Practitioner can run it, using your own checklist or SQFI's. Testing your recall system is not optional. Edition 9 requires a recall and withdrawal test at least once a year that traces incoming materials at least one step back and finished product at least one step forward. Edition 10 requires a yearly recall test that covers every part of the recall program, plus a yearly trace test.

How long do you have to fix SQF non-conformities?

Under Edition 9, corrective actions for minor and major findings must be verified and closed within 30 calendar days of the audit, with a root cause analysis for each. Under Edition 10, the deadline is 40 days. Longer fixes can get extra time if temporary controls are in place, but the finding must still be closed in the database on time.

What happens if you fail an SQF audit?

At an initial certification audit, a score below 70, a critical, or missed corrective action deadlines means no certificate, and the site has to reapply. At a re-certification audit, a failing result suspends the certificate. Under both editions, it's reinstated only after the certification body verifies your corrective actions on site, and an unannounced surveillance audit follows within six months of the suspension.

Are SQF audits unannounced?

Most are scheduled, but SQF requires one unannounced re-certification audit every three years, inside the 60-day re-certification window, on a date the certification body picks. It's fully on site, and refusing entry leads to immediate suspension. Under Edition 9, the first three-year cycle starts at initial certification, and sites in an SQF multi-site program are exempt. Under Edition 10, it starts at the first re-certification audit. Blackout dates for times you aren't operating are due at least one month before the window under Edition 9, and at least 90 days before it opens under Edition 10.

Where can I get the official SQF audit checklist?

SQFI publishes free Excel checklists for most Edition 9 and Edition 10 codes, including Food Manufacturing, on its Guidance & Checklists page, along with guidance documents and tip sheets. The code requires internal audits to use the SQF checklist or a similar tool.

Can our certification auditor help us fix findings?

No. The auditor can explain what a finding means, but certification bodies must stay impartial, so they can't tell you how to fix it. Your own team does the root cause analysis and corrective action, and the auditor verifies the evidence you submit. SQFI's free guidance documents on root cause analysis and corrective action can help, along with our guide to root cause analysis in SQF audits.

Ready to schedule your SQF audit?

Talk to our team about SQF certification audits by ASI Food Safety, LLC, an SQFI-licensed, ANAB-accredited certification body.

Questions? Email US.Info@kiwa-asi.com or call 1 (800) 477-0778.

Keep reading

Sources

  1. SQFI. Prepare for Your Audit (accessed October 13, 2026). sqfi.com
  2. SQFI. SQF Food Safety Code: Food Manufacturing, Edition 9 (Part A, Steps 1 to 13; Part B, Module 2 System Elements and Module 11 Good Manufacturing Practices). sqfi.com (PDF)
  3. SQFI. SQF Food Safety Code, Edition 10, Part A: Implementing and Maintaining the SQF Food Safety Code (A2:1 to A2:28; updated September 1, 2026). sqfi.com
  4. SQFI. Edition 10 FAQ (accessed October 13, 2026). sqfi.com
  5. SQFI. Which Code Edition Should I Use? (accessed October 13, 2026). sqfi.com
  6. SQFI. “How to Get Your Site Ready for SQF Edition 10 Before the 2027 Deadline,” SQFI blog, March 3, 2026. sqfi.com
  7. GFSI. “New public stakeholder consultation for: SQFI Ed. 10 | GFSI BMRs v2024,” September 29, 2026. mygfsi.com
  8. SQFI. SQF Food Safety Code: Food Manufacturing, Edition 10, Module 2 and Module 11, with the Edition 10 Food Manufacturing Checklist. Code Selector; checklist (Excel)
  9. SQFI. Tip Sheet 05: The Site Audit (written for the SQF Fundamentals Program; the audit-day steps apply generally). sqfi.com (PDF)
  10. SQFI. “How Does Your Food Safety Culture Stack Up? Know What your SQF Auditor is Looking For,” SQFI blog, March 7, 2019. sqfi.com
  11. SQFI. SQF Food Sector Categories (accessed October 13, 2026). sqfi.com
  12. SQFI. Register for SQF Certification (site registration pricing; accessed October 13, 2026). sqfi.com
  13. SQFI. Guidance Document: Practitioner & Substitute Practitioner (updated February 2, 2026). sqfi.com
  14. SQFI. Glossary (Edition 10; accessed October 13, 2026). sqfi.com
  15. SQFI. Select and Schedule Audit (accessed October 13, 2026). sqfi.com
  16. SQFI. Guidance & Checklists (accessed October 13, 2026). sqfi.com
  17. SQFI. Guidance Document: Internal Audits & Inspections (updated February 2, 2026). sqfi.com
  18. Kiwa ASI. SQF Certification (accessed October 13, 2026). asifood.com
  19. SQFI. “Strengthening Food Safety: Tackling the Top Non-Conformances in SQF Code Edition 9,” SQFI blog, July 11, 2023. sqfi.com
  20. SQFI. Edition 9 Code Amendments (accessed October 13, 2026). sqfi.com
  21. SQFI. “3rd Party Audits and Regulatory Inspections,” presentation by SQFI's Vice President of Technical Affairs, January 2024 (hosted by AFDO). afdo.org (PDF)
  22. SQFI Help Center. “How do I complete my corrective actions in the SQF Assessment Database?” (updated October 28, 2025). sqfi.com